• National History Day
    2012-2013
    Due Date: 1/10/12
    Types of Projects Accepted:
    DocumentaryPerformancePaperWeb Site

Nation History DayImportant Dates

I have decided to require the NHD project to be turned in several steps. The reason for this is the lack of response that I received from the earlier worksheet that was due last Friday.

  • Each item will be worth 55% of your grade. Each day the assignment is late I will subtract 15 points.

  • Timeline:
  • Rough Draft of Thesis: 8/24
  • Sources Review list: 8/31
  • Format of Project Decision: 9/7
  • Thesis Due: 9/14
  • Rough Draft of Bibliography: 10/5
  • Rough Draft of Annotated Bibliography: 11/02
  • Rough Draft of Project due: 11/16
  • Process Paper due (1paragraph): 12/07
  • Project Due: 1/10

  • Turn in project any time prior to January 10, 2012.